BYD is moving to deploy a high-power "flash-charging" network in Canada, revealed by a Toronto-based job posting for a manager to lead expansion and business growth. The megawatt-class chargers are advertised to add about 400 km of range in five minutes but require vehicles built on BYD’s 1,000-volt Super e-Platform or its second-generation Blade battery with up to 1,500 kW acceptance. BYD already installed nearly 6,000 flash-chargers in China over the past year, opened a first megawatt station in the U.K., and aims for 20,000 in China by year-end. Those chargers deliver more than three times the power of existing public chargers in North America; for context, Tesla’s V4 Superchargers top out at 500 kW and most North American EVs accept a maximum of about 350 kW.
The Canadian role outlines responsibilities such as building cost and profit models (including subsidy scenarios), coordinating grid upgrades and local partners, planning station rollouts, managing construction with BYD headquarters, and operating sites with local partners. BYD has posted multiple Canadian launch jobs and is scouting sites for roughly 20 dealerships, signaling a broader market entry that could justify the network investment despite import-tariff caps. The plan promises stronger public charging infrastructure and improved winter charging performance - BYD claims its Blade battery can charge from 10% to 70% in five minutes at −20°C - but faces permitting, grid and cost hurdles before a first tranche of stations appears.
Summary generated by AI from the linked article. hn.today is not affiliated with Hacker News or Y Combinator.