hn.today

533M tunnel dug through rock from opposite ends around 700 BC

jesussavescities.com5 points0 comments
Screenshot of 533M tunnel dug through rock from opposite ends around 700 BC

Hezekiah’s Tunnel, also called the Siloam Tunnel, carries water about 533 meters from Jerusalem’s Gihon Spring to the Pool of Siloam. Cut through limestone around the late eighth century BC, it slopes only about 30 centimeters along its winding course and still carries water. Its unusual construction involved two crews digging toward one another from opposite ends, without intermediate shafts. A Hebrew inscription found in 1880 describes the workers hearing each other through the rock and meeting with their picks; its stated length of 1,200 cubits roughly matches the tunnel’s measured distance. The inscription records practical details rather than praising a king.

A 2003 study in Nature dated plant material in the tunnel’s plaster to roughly 800-510 BC and used stalactites to rule out a much later date. The evidence supports a date around Hezekiah’s reign, though archaeologists disagree about whether construction may have begun earlier. The crews’ exact method of finding each other remains uncertain: proposals include following rock fractures, receiving signals from people tapping above, or shaping the route to maintain a gentle slope. The tunnel’s irregular meeting point and abandoned side cuts remain clues. Its existence and approximate date fit the Bible’s account of Hezekiah bringing water into Jerusalem, but this supports one historical claim, not every biblical passage or its spiritual teachings.

Read on jesussavescities.com0 comments on Hacker News

Summary generated by AI from the linked article. hn.today is not affiliated with Hacker News or Y Combinator.

More in Science

The daily digest

Today's best Hacker News stories, summarized and screenshotted, one email a day.

533M tunnel dug through rock from opposite ends around 700 BC · hn.today